A REAL, GROWING MARKET

Energy Systems & Infrastructure

Central Asia is rapidly expanding, with industrial and 5G demand set for major growth this decade as Kazakhstan secures vital Middle Corridor trade and energy agreements. As the first renewable, grid-independent platform in the region, we offer partners a unique chance to scale within this power-intensive hub.

SITE FUNDAMENTALS

Power: On-site solar generation underway; wind under active assessment. Up to 30 MWp planned capacity at full development.
Land: 20 hectares secured with graded areas and access routes prepared for phased build-out.
Infrastructure: Space allocated for data, logistics and light manufacturing facilities, with room for future expansion.
Connectivity: Positioned on the Middle Corridor, Central Asia's key overland trade route linking EMEA and APAC.
Location: Almaty Oblast, Kazakhstan — 30km from Almaty.

WAYS TO WORK WITH US

Co-development · Joint venture · Power off-take agreement · Space lease · Testing partnership

Development Roadmap

A phased strategic implementation plan for the region's first grit-independent energy platform, ensuring scalable infrastructure and operational resilience.

01

Feasibility & Planning

Comprehensive site studies, resource assessment, and technical origination finalized for long-term viability.

02

Infrastructure Development

SECURED AREA build-out, preparing access routes and grading 20 hectares for core operations.

03

Generation Staging

Initiation of Phase 1 generation capacity (up to 15 MWp) and grid connection technically verified.

04

Full Operational Scale

Expansion to 100 hectares, integrated logistics, and high-capacity export connectivity.

TECHNICAL SPECS

A detailed overview of the core technical parameters and institutional infrastructure supporting the first renewable, grid-independent platform in the Almaty region.

PHASE 1 GEN

Indicative 10–15 MWp capacity pending final grid connection studies and technical verification.

SITE INFRASTRUCTURE

17ha secured area with immediate expansion potential to 100 hectares for integrated operational facilities.

NETWORK CONNECTIVITY

Strategic technical alignment for high-capacity export and resilient cross-border data transmission.

PROJECT SPONSORSHIP

UK-based technical origination, commercial structuring, and asset-lifecycle management capability.